Selecting the ideal flooring for your home is an important choice that affects energy efficiency, comfort, and general aesthetics. With so many options available, each with pros and cons of their own, it’s critical to prioritize your needs and comprehend the differences between various flooring materials. The atmosphere and practicality of your living space can be greatly impacted by the flooring type you select, regardless of whether you’re building from scratch or remodeling an existing home.
Durability is one of the main things to take into account when choosing flooring for your home. The amount of foot traffic and wear that different parts of the house receive should be considered when selecting a flooring material for your home. Sturdy flooring options like hardwood, tile, or laminate may be better for high-traffic areas like living rooms, hallways, and entrances. These materials guarantee long-lasting beauty and functionality because they are stain, fade, and scratch resistant.
In addition to longevity, comfort and insulation are important factors. Your home’s comfort and temperature can be affected by the flooring you select, especially in colder climates. Carpet flooring is a popular option for the best insulation and warmth because it offers a comfortable surface that retains heat and lowers energy costs. Carpeting is a great choice for bedrooms and family rooms where noise reduction is desired because it can also help absorb sound.
Even though carpeting provides excellent comfort and insulation, it might not be the best option for every part of the house, particularly those that are wet or prone to spills. Because they require less upkeep and are water-resistant, alternatives like tile or vinyl flooring might be a better fit in certain situations. Since spills and moisture are commonplace in kitchens, bathrooms, and laundry rooms, these materials are perfect for these spaces.
Moreover, aesthetics are a major consideration when choosing flooring for your home. The visual appeal of your interior space can be improved by choosing flooring that reflects your personal style and complements your decor. There are a plethora of options to fit your aesthetic preferences and design goals, whether you favor the versatile nature of laminate, the sleek modernity of tile, or the classic elegance of hardwood.
In conclusion, durability, comfort, insulation, and aesthetics are all important considerations when selecting flooring for your home. You can make an informed choice that improves the aesthetics, usability, and comfort of your home for years to come by being aware of the distinctive qualities of various flooring materials and evaluating the requirements and preferences of your household.
Concrete Floors | Pros: Durable, good thermal mass for retaining heat. Cons: Can be cold, may crack over time. |
Wooden Floors | Pros: Warm and comfortable underfoot, aesthetically pleasing. Cons: Prone to damage from moisture and pests. |
- How to make a concrete floor in a private house
- How to make a floor in a private house from boards
- Paul from boards in two layers
- Paul from concrete
- Warming on the lags
- Installation of mineral wool
- Vapor barrier and laying the floor
- Floors. Laminate.Blogstroiki linoleum
- How to care for properly
- Materials
- General principles of wooden floors
- Swimming screed on an interference ceiling in a private house difference from flooring by ground
- We select a kitchen coating
- Technology of insulation
- Preparation
- Waterproofing layer
- Black screed and laying insulation
- Finishing
- Ceramzite insulation
- Insulation of the concrete base
- Floor for the living room
- Which to choose
- Dry screed in the house plan of work
- 4 Secrets of the Warm Paul device
- Tools necessary for independent creation of concrete floor
- How to choose lags
- Wooden flooring options
- Thermal insulating materials advantages and disadvantages
- Ceramzit
- Styrofoam
- Mineral wool
- Foam
- What are the black floors in wooden houses
- Profitability of dialing black bases
- Installation of wooden floors
- Concrete floor
- Brand Coating in a private house
- Laying a wooden floor
- Black floor for soft flooring
- Video – Black Paul Construction
- Finishing
- Paul device diagram
- Methods of installation of a summer cottage
- Video on the topic
- Floors on the ground. Surning and high quality.
- Which floor is better to make in a private house? Concrete or wooden?
- What gender to make in the house? From cheap to expensive materials
- What floor covering to choose? Types of flooring: laminate, PVC stamp, porcelain tile, board
How to make a concrete floor in a private house
In a suburban building, this option can also be utilized. Concrete floors are typically constructed in residential settings. Here’s how they are poured:
- A shallow foundation jacket is dug up in the room (10 cm).
- Its bottom is aligned and compacted by a manual roller.
- Sand is poured with a layer of 5 cm. It also needs to be closed.
- A reinforcing mesh is laid on wooden cubes.
- Lighthouses are exhibited.
- The concrete mixture is poured.
It is preferable to begin laying the solution from the angle’s door faster. Making a filling only once is advised.
It will take no less than two weeks for flooded concrete floors to regain their strength. Following this time, you are free to begin walking on them. But you shouldn’t move large furniture or appliances into the space before a month has passed.
How to make a floor in a private house from boards
Paul from single-layer boards. is the most basic floor choice. This design is only appropriate for summer homes or structures in warm nations. When a building’s design calls for floor beams to be embedded in the walls, the spacing between beams is typically too great to allow for the quick installation of masonry boards.
It will be necessary to lay the lag in order to guarantee the required strength. The beams can be placed as needed right away if the floor is intended to be arranged on top of the supporting pillars.
Lags are now installed on top of the load-bearing beams, which are exhibited strictly horizontally. Wooden gaskets and wedges are used in this process. Once all of the lags have been located using a level, they need to be nailed to the beams before the floorboard is nailed to them.
Paul from boards in two layers
Significantly more money and work will be needed to set up this kind of sex, but the reduction in heat loss will make up for it. Coniferous wood is a better choice for the rough floor arrangement. You can use a croach or a trimmed board instead of spending money.
Thermal insulation is typically installed in the area between the draft and the last floor.
You can use expanded clay, a clay-wood sawdust mixture, or straw as thermal insulation. Modern materials like polystyrene or extruded polystyrene foam are obviously an option. Downstone is used as thermal insulation in the steering floor.
Paul from concrete
There are various phases to the concrete floor’s equipment:
- First of all, marking is made. It is better to use the laser level here. After installing it, it will mark the walls under the future floor in the right places. To mark the level in the center of the room, threads are pulled from the marks in the walls.
- Next, we make gravel filling. This is thermal insulation in your floor. Earth should be cleaned of plants so that they do not sprout through the floor. After that, drive the stakes, so that their level does not reach the level of the future gender per 100 mm. The spray starts from the wall located opposite the door. After filling the entire area, the gravel is leveled and compacted, and the pegs are removed.
- At the next stage, sand is poured, compacted and lered.
- The arrangement of proper waterproofing plays a huge role, the moisture insulation of the concrete floor is usually carried out with plastic film, the thickness of which is at least 250 μ.
- Next, we fill in. First of all, you should set a level of lighthouses, which use wooden or metal rails, the distance between which is from 1 to 1.5 m. The upper edge of the rails should come into contact with stretched threads. Then, rope marking is removed.
- Now pouring the interior space by concrete, from the end of the room to the door. After that, concrete is aligned using the rule.
Following the concrete’s "setting up," the rails should be disassembled and the spaces filled with the solution. For plaster, a "grater" is used to align the solution in the fractures. A plastic film is then applied to the floor and left in place for a month. Concrete is better when it is periodically moistened. Concrete recruitment will be able to reach its maximum strength as a result.
Warming on the lags
In older homes, it is frequently necessary to remove the ceiling and dig below the surface before heating the floor.
Next, a black coating—typically made of wood—was applied. On top of it is a layer of waterproofing, which could be made of roller materials or mastics. They will shield the lags and insulation from moisture.
After that, lags—wooden boards or bars—are installed on a waterproofed draft floor. First, an antiseptic must be applied to all wooden components.
Installation of mineral wool
Mineral wool is a better option for insulating wooden structures because it doesn’t burn. If the material is in a roll, it is unfolded with the entire canvas and laid down without being cut into individual pieces beforehand.
Staple Vata back together. In the spaces between lags, mats or plates are firmly laid.
Vapor barrier and laying the floor
Over the insulation is a layer of vapor barrier. It may be expert membranes or a thick plastic film.
After that, the last floor is installed, with a ventilation space left between it and the insulation. Installing a fine-mesh metal mesh underneath it is advised by experts as it will prevent rodents from entering the house.
It is possible for one person to handle the task of floor insulation in their own home. The most important thing is to consider thermal insulation technology and select the best, highest-quality insulation.
Floors. Laminate.Blogstroiki linoleum
It won’t fully comprehend the message about the floor on the ground or that a concrete base is intended for the installation of plank flooring. Furthermore, it is unknown what the building’s base is.
One thing is for sure, though: when dealing with damp soils, a waterproof layer needs to be constructed. This layer can be made of concrete, clay, polyethylene film, or other materials, and the floor’s level shouldn’t drop below the sidewalk’s level.
Leveling and prepping the base are necessary steps to take before setting up a new concrete floor on the ground. But trash needs to be removed from the soil’s upper surface first. An optical or laser level, as well as a regular level at home, can be used to create the base of the base. Determining the relief of the floor’s base, zero mark, and level levels is the aim of this operation.
When preparing the base, it is necessary to dig a trench with a depth of 500-1000 mm, depending on the types of soils of the base, the degree of freezing, the height of the lift of groundwater. Then you should tamp the bottom well to avoid further cracking of the floor due to the subsidence of the base. After tamping on the soil with overlap on the walls of the trench, geotextiles are spread and a sand cushion is filled up, the thickness of the layer of which also depends on the state of the base soils and ranges from 500 to 11000 mm. Sand pillow is also necessary, periodically wetting, compact. On top of the sand pillow is made of gravel or crushed stone with a thickness of the layer of 100-150 mmotespes, which is then embedded in the sand.
Waterproofing is applied after the crushed stone-covered sand pillow has been tamped. It is typically composed of polymer membranes with an overlap on the walls or rolled bitumen waterproofing materials. If there is a lot of groundwater in this area, you can also add hot bitumen to the crushed stone layer, adding about 20 mm of layer thickness. An underlayment of polyethylene film will suffice if the soil is dry and leaks do not pose a serious risk to flooring.
It is recommended to use concrete no less than M300 for the installation of a cement-sand screed, with a maximum variance in screed thickness of 30 to 50 mm. The standard reinforcement option is a road grid, and a minimum thickness of 1,100 mm is recommended for the concrete floor on a tamped soil base. Polymer impregnation can be used to prevent the formation of concrete dust and strengthen the concrete’s surface.
How to care for properly
The floor must be maintained in accordance with the guidelines for maintaining the finish coating material.
Since Paul is one of the primary interior features, it’s critical to follow the specified criteria when selecting floor materials. The coating is chosen based on the room’s intended use.
For instance, parquet does not like moisture, and linoleum cannot support heavy loads.
There are several categories into which materials used for finishing coating can be divided: solid and soft, stone and wooden, synthetic and natural. Every kind of material has unique styling elements and maintenance requirements.
Stone and tiles are examples of hard materials. They are resilient and do not mind getting wet. Thanks to modern technology, you can now install tile floors in rooms other than the kitchen and bathroom. It is simple to swap out the tile for a different one if preferred. Natural stone is available for use in tiles, including marble, granite, and, if budget permits, malachite, jasper, and rhodonite.
Although synthetic materials like concrete and vinyl are useful, they are susceptible to mechanical, chemical, and temperature changes as well as humidity and changes in temperature. A mixture of cement, traffic jams, rubber, marble crumbs, and chalk is used to make rubber for floors. It is robust, flexible, and resistant to temperature changes and mechanical loads.
Oddly enough, linoleum is natural. It is created by putting a hot mixture on the fabric base that contains tar, beeswax, and linseed oil. Although pricey, natural linoleum is an amazing material.
Wood is the most prevalent surface. Different wood species are used to make wooden coatings. Oak coating is the most costly and long-lasting. Additional woods used are maple, beech, elm, ash, linden, birch, cherry, and pine. These days, modern wood materials are laminates, which have multiple layers. Its top layer is composed of wood. The laminate is cheap, easily mounted, and has an organic tree-like appearance from the outside.
Nowadays, carpet is no less common. A pile of carpet is fixed to the substrate. Carpet can be natural, made of wool or silk, or synthetic, made of nylon or acrylic. Simply place it and replace it if needed.
In the current environment, it’s critical to properly coat the floors with an appropriate coating and to understand proper maintenance. Certain cleaning agents can occasionally damage even the strongest materials.
If the coating has a smooth surface, it can be cleaned by wetting a small section of the floor with water and then quickly wiping it dry.
Warm water is used to wipe down wooden surfaces along with a neutralizing agent, moving in the direction of the parquet or floorboard installation. There’s no need to heavily moisten the surface, particularly if the flooring is parquet. This may cause him to swell. It is preferable to use a little vinegar in place of soap. There won’t be any outward divorces in this situation. Furthermore, vinegar revitalizes the wooden coating’s color perfectly.
Warm water mixed with a neutral agent is used to treat Paul made of stone, shale, and ceramics. Acetic acid is used in place of the detergent for tiles that are not glazed. She’ll take the stain off the surface and apply a uniform, muted finish. Oils made of citrus are periodically applied to the shale floor. Just wet the marble coating and give it a thorough wipe down. Wax and oil are not tolerated by marble. He takes advantage of them.
Floors made of linoleum cannot be heavily wetted. It is cleaned with a warm water and neutral agent solution, allowed to dry, and then waxed.
Synthetic and vinyl flooring are possibly the easiest to maintain. Taking care of something involves rinsing with clean water after washing it with universal detergents. Detergent composition needs to be watched carefully; solvents should not be present or the surface will become porous and harsh to the touch.
At minimum, vacuum the carpet twice a week. If the material permits, wash it twice a year with a specific shampoo. If the coating is composed of natural materials and cannot be cleaned with water, it is processed once a month using a unique dry powder in the following manner:
- Process the surface with a vacuum cleaner.
- Scatter powder throughout the area
- After two hours, re -process with a vacuum cleaner.
Proper care, contemporary technologies, and high-quality materials are the three elements of a successful sex.
Watch the following video to learn how to create a warm floor in your home without making any mistakes.
Materials
In a private home, the flooring is arranged using materials that optimally maintain the internal microclimate.
These structures are built using a variety of material groups, including:
- Lumber. This group of substances is used during the construction of floors based on lag. The most popular products are wooden bars, a board of various thicknesses, sawdust (heat insulator). This group includes plywood, OSB and other plates based on wood processing products.
- Insulating materials. This group is also very wide and includes substances for arranging hydro-, steam and thermal insulation. Products of this type include roller materials (film, roofing material, all types of mineral wool), as well as bulk structures (expanded clay, sand, gravel, and t. D. ). Many of these substances do not form a separate layer. They are intended to cover and isolate other elements of the system.
- Decorative finish. There are also several types of similar coatings. The most common boards are considered, ceramic tiles, laminate, parquet, etc. D.
You can create universal floor coverings with a variety of functional and aesthetic qualities using all of them. Certain ones are limited to use in specific scenarios.
Concrete floors work well for floor heating systems because they can withstand variations in humidity and temperature.
General principles of wooden floors
Overtly sexual Although boards are always placed on lags, lags themselves can be stacked on supports, which are typically made of brick, wood, or metal pillars, as well as on a concrete or even earthen base. Seldom, but still, a technique is used where the ends of the lag are fitted into the walls on either side of them or placed on ledges that are specifically designed to be close to the walls and function without the need for intermediary supports. It is nearly impossible to install them correctly on their own, and blocking wide spans in this situation requires lags of a very large section and weight.
The system of concrete foundations with wooden floors It is essentially the same as installing floors with reinforced concrete plate overlaps in an apartment. Installing a floor on a private home’s ground floor presents a far more difficult situation because it is highly desirable to set up a dry, ventilated subterranean space in this instance. The strength and longevity of the completed floor are significantly influenced by its presence, particularly in situations where groundwater is heavily arranged.
In deciding which floors to install in a private house, it"s crucial to consider both practicality and comfort. Hardwood floors offer timeless elegance and durability, making them a popular choice for many homeowners. They"re easy to clean and maintain, and can withstand heavy foot traffic. On the other hand, laminate flooring provides a cost-effective alternative that mimics the look of hardwood while being more resistant to scratches and moisture. Tile floors are another excellent option, particularly for areas prone to moisture like bathrooms and kitchens, offering durability and easy maintenance. Carpeting, though soft and cozy, may not be the best choice for high-traffic areas or households with pets due to its tendency to trap dust and allergens. Ultimately, the best choice of flooring depends on your lifestyle, budget, and the specific needs of each room in your home.
Swimming screed on an interference ceiling in a private house difference from flooring by ground
A concrete screed on interstory ceilings does not significantly differ from what was previously discussed in this article’s section, based on the method of creation. However, there are a few subtleties that you should be aware of.
- The thickness of the pillow under the concrete screed is significantly reduced – unlike the floors along the soil, there is no need to compensate for the soil tuning and delay water from the soil. In the floors of inter -story floors, the pillow plays the role of an elastic base, through which loads from the screed are transmitted to the supporting structures of the house. Floating screed on an interference ceiling in a private house
- At the same time, the need for insulation disappears – when creating a screed on inter -story floors before the owner of a private house is not the task of reducing the loss of thermal energy.
- Particular attention must be paid to the brand of mixed concrete – for floors, where simple finishes and minimum loads are supposed, it should be not lower than M50. And with a more modern and expensive decoration or the presence of a large amount of furniture and people in the room, it is better to use the material of the M150 brand and above.
- Between the walls and the concrete screed, a damper is necessary in the form of silicone tape-in this case you will not have problems due to the difference in “behavior” of materials in conditions of changes in temperature and humidity.
- Before starting work on arranging a concrete floor on ceilings, a product of calculations of the permissible load and the total mass of the structure is required.
One more sewing pie cake example
When DIY-ing a concrete floor in its cottage, keep in mind that the only way to get a strong, dependable coating that can endure over a dozen years is to strictly adhere to standards and technologies.
We select a kitchen coating
Kitchen floors are more prone to increased loads in both private homes and apartments. They must therefore be constructed to be as resistant as possible to abrasion, heat, moisture, and different types of mechanical damage. Which coating are we suggesting? There are numerous choices, and each has pros and cons of its own:
- cork floors that came into fashion just a few years ago. Of the pluses, stability can be distinguished by almost any aggressive influences and durability. The main minus is quick pollution in the cooking area and the difficulty in care;
- tile. The usual tile, which was used a couple of decades ago, is most likely not suitable for the kitchen, since it is too subject to mechanical influences. But you can well replace it with stone tiles with incredible strength and moisture resistance. The only drawback should be called only the high cost. However, the stone floors will pay off for many years of operation;
- Another option for the kitchen in a private house is porcelain tiles. This material is much cheaper than natural stone, but in its operational properties it is practically not inferior to it;
- linoleum. The best choice if you want to equip inexpensive floors in the kitchen in a private house. He can withstand heavy loads, but is unlikely to transfer the effects of hot steam or dripping hot fat. However, you can replace the damaged area at any time – the low price allows you to do this quite often;
- The laminate mentioned above is also suitable for the kitchen. But it is best to choose a special moisture resistant material that repels water and does not destroy under a long effect.
What should be used for technical rooms’ floors? The same levels of strength, abrasion resistance, and water resistance are still necessary for them in a private residence. Taking into account the plethora of advice shared on the internet, it is suggested that specific ceramic stove collections be utilized in bathrooms. Comparable materials are ready to serve you for many years and can withstand nearly any impact.
Technology of insulation
The following supplies must be ready before installing the heat insulator: the required amount of insulation, film with a density of at least 200 microns, cement, sand, water, beacons, and reinforcing mesh.
The warming insulation process is broken down into multiple steps.
Preparation
Prior to that, you must manually remove any excess soil that is between 10 and 15 cm thick, or you can pour sand and crushed stone directly underneath the suspected gender.
Leveling the surface is necessary.
Waterproofing layer
A thick layer of oilcloth is used to create a waterproof layer that will delay the occurrence of groundwater and stop humidity and condensation from rising.
The beacons must then be installed.
Black screed and laying insulation
Following that, a 40 mm-thick cement screed is applied.
On the solution, foam slabs are arranged in a checkerboard pattern and adhere closely to one another. Both heat and cold will not be able to enter the house because of the insulation. After that, give the screed two days to dry off.
Finishing
A final screed is the last phase of the project. The beacons must be attached in order to give the heat insulator a level surface.
After that, a layer of cement mortar, about 70 mm thick, is poured over the whole structure. On top of it, a grid of reinforcement is placed to prevent the screed from breaking and collapsing. The surfaces are cleaned of the influx and aligned once they have had time to dry.
Ceramzite insulation
Since private home floors are subject to heavy loads, you must carefully calculate the thickness of the heat-insulating layer and the size of the screed if there are expedient expanses used as insulation. Using different-sized expanded clay is advised by experts as it will result in a denser layer of insulation.
The entire work process is comparable to what was previously mentioned. Over a black screed, a layer of expanded clay that is at least 10 cm thick is applied. When installing floor insulation, the layer must be level and without any slope; otherwise, it won’t work as intended. Using a unique template or roulette, the control measurement of the distance between the beacons and the backfill can be completed.
Cement milk is applied to expanded clay prior to the final screed being poured; this helps hasten the setting of the insulation and increase its durability. The surface of the advancement will be relieved by the reinforcing mesh placed on top, cracking.
The floor cannot be used for a week. At its strongest, the entire structure will last for roughly a month. You can then install a beautiful floor.
Insulation of the concrete base
Hard boots made of mineral wool work better as heaters for floors where there is an overlap caused by a monolithic reinforced concrete slab.
By adding a concrete screed on top of the heat insulator, you can increase the design’s durability and warmth. Minvatu must first have a mounting net covering applied.
Floor for the living room
In a country house, the living room is typically utilized for hosting guests or as a place for the whole family to gather and relax.
Whatever the situation, this is the front of your house, so it’s critical to use only the best materials with excellent aesthetic qualities here.
You can use the classic wooden parquet as an example, which looks fantastic with the right styling and upkeep.
To avoid making a mistake in your selection, be sure to consider the type of wood used to make the material as well as the varnish coating, which can give the parking a distinctive shine.
Which to choose
The reason for a building’s existence determines which structure is preferred. There is no need to build intricate structures in the summer kitchen or in the country, which are used during the summer months. The boards are placed on the lags in this instance. Naturally, a floor like that won’t be warm.
It is preferable to use larger, more substantial structures in the capital home that is inhabited year-round.
The ground floor of the first floor is the most economical and easiest to complete if the house does not have a basement. There are two options available at the same time: either they install multi-layer wooden floors on the lags, or they use the concrete base, also known as the screed.
The way the floors are arranged between them will directly affect what the second floor will look like. A wooden foundation is constructed with beams and lags. All that is needed if the floors are made of reinforced concrete are lags. Paul may be on beams, lags, or concrete slabs on the second story, just like on the first.
If the building has a cellar or basement, the floor in that area needs to meet specific requirements. It ought to be the most stable and insulated structure because of how close to the earth it is. The material is selected based on the intended use of the space: for example, if a living room is to be built in the basement, a tree is the preferred choice; if a workshop is to be built, concrete screed will be suitable; and if a cellar is to be used for storing winter reserves, clay is the best option.
Finding out the groundwater depth will not be unnecessary when setting up a cellar, as it will help to prevent unpleasant surprises.
Dry screed in the house plan of work
Like I said, the quick installation of this coating makes it appealing. With or without outside assistance, it can be outfitted in a single day. Typically, materials like silica, expanded clay, or slag are employed. They nearly never shrink and are evenly distributed throughout the surface because of their loose structure. Additionally, these "dry" floors help to keep the heat in the house intact.
Http://sdalalremont.ru is the source.
We will create the dry screed installation in accordance with this straightforward plan:
- Prepare and compact the base, cover it with waterproofing.
- We install wooden redemption boards at a distance of 60–80 cm on the waterproofing layer. We mount the beacons, thanks to which our screed will be uniform.
- We scatter the "dry" floor and align the rule.
- We cover the surface with plywood stoves starting from the door and moving deep into the room.
- We cover the joints of the joints of the plywood and walls with sealant.
- Our foundation is ready for finishing work.
Now that you are aware of all the subtleties involved in installing a concrete, wooden, and "dry" floor, you can choose the best coating to use. I’ve got everything here! Share with friends and sign up for our social media updates! Goodbye!
4 Secrets of the Warm Paul device
The use of warm water floors is becoming more and more common. It can be the foundation for keeping comfortable living conditions or for heating. It depends on the typical heat loss, the local climate, and the specific architectural elements of a private residence. They don’t work well with wooden floors because the tree doesn’t conduct heat well. Cement screed is the best choice. If the base is a sand pillow, the first basement floors are covered by a concrete floor with water heating.
The base must be prepared; it should be level and free of indentations and recesses before you can install heated floors by hand. Five millimeter drops are allowed. Apply a leveling layer of small crushed stone with a grain size of no more than 5 mm if defects are higher or deeper than 1-2 cm.
There are two ways to operate the warm floor device: spiral and snail. The first version uniformly heats the entire surface. In colder climates, the spiral provides optimal heating. As a result, this zone is where the first hot branches are mounted. The required pipe length is determined based on the drawing scheme.
One whole pipe is used for the floor that receives heat. If the room is large, multiple heating contours are installed; however, each contour should not be larger than 100 m in order to ensure sufficient pressure for the coolant to circulate.
Use of 16 mm diameter metal-plastic pipes is preferable. A heater is installed on the base with a minimum thickness of 5 cm to provide thermal insulation. The insulating layer is created by 10 cm if the base is the earth or if the floor is below the cold room. The heat insulator is covered with a metallized film that serves as a reflective screen to reduce heat losses. Additionally, it needs to be protected, so 75–100 microns of polyethylene are placed on top. Construction tape is used to secure the seams where film stripes are present on the overlap.
Fasteners such as plastic brackets, metal mesh, and strips are used to secure pipes. Following the laying process, the collectors are connected, and the system is filled with coolant at a pressure of four bar. To account for expansion, insulate the floor from the walls thermally, and remove cold bridges that allow heat to escape, damper tape is wrapped around the perimeter.
If the strips and brackets were used as fasteners, the reinforcing mesh is installed before concrete is poured on top of the pipes. The thickness of the concrete screed is 5 to 10 cm, and the solution should be at least 3 cm above the pipe. Surface cracking can occur when there is insufficient thickness or excessive heat loss. Although the concrete will hold, a plastic film covers it to keep the humidity at a normal level. 28 days to complete the screed.
Tools necessary for independent creation of concrete floor
Prior to delving into detailed guidelines for setting up a concrete solution coating, we’ll go over a list of tools that the master will require to complete this task.
Table: Work tools on a country house’s concrete floor.
Crucial! When working with a large area floor, it is better to hire a truck and stirrer instead of kneading the concrete by hand because the time savings will offset the higher cost.
How to choose lags
Lags are rectangular bars that are positioned parallel to one another to form the base of the floor. It is a sturdy tree with coniferous wood. Strength is the primary criterion for selection. Material that shows indications of starting to deteriorate cannot be used. It is not frightening when there are a lot of knots present. A 50 x 150 or 100 x 150 mm bar works well for the summer structure lag. There are more requirements for the strength of the basis in larger rooms. Sometimes placing paired boards on the rib is sufficient.
How to select lags
The lag’s position and height are chosen.
There should be a ventilation gap between the final floor and the insulation at the height of the lag. Both the thickness of the insulation and the sizes of lumber used to build the floor frame must match. For instance, it is not always feasible to install a heater with a height of 100 mm when the lag height is 150 mm. Remember that there will be a skull bar and a black floor board a few centimeters beneath them. An extra rail can result in a height increase in lag.
Wooden flooring options
It is rare to find stone or concrete flooring in a private residence these days. It is nearly impossible to make them genuinely warm floors in a private home, even with strong thermal insulation, which is why most owners would rather construct a wooden floor themselves. Wooden floors can last for several decades if properly maintained, but they still require regular maintenance in the form of updates, repairs, and restorations.
Three methods can be used to create the customarily warm floor version in a private household:
- Make a laying of the classic floor from boards, with insulation of mineral wool or backfill from expanded clay;
- Flooring from boards on lag beams laid on a concrete pie, with thermal insulation of polystyrene foam;
- Laying lag beams on column supports.
In the first two examples, the rich soil is swapped out for a composite layer made of sand and gravel that has roofing material lobes glued to it. In addition to the main sex, the draft base from the boards needs to be laid if the private room’s floor insulation is behind expanded clay. A film vapor barrier must be built on top of the backfill, and a new floor made of polished board must be laid next.
The second scenario involves laying a heated floor over the lags, supported by an EPS insulation layer, a double concrete screed, and reinforcing mesh. Law beams may be supported by threaded hairpins or the wall’s basement.
Although both options are fairly effective, they are currently regarded as being too expensive because it is obvious that the stud system with a concrete pillow and large suspended lags will be fairly expensive. Thus far, the flooring has been installed in a comparatively small private room that spans 10 to 15 square meters. How can a private home’s floor be made to feel cozy in an economical manner?
Installing flooring made of boards on column supports is the most contemporary and straightforward assembly method. When deciding how to install a floor in a private home, you need to consider factors like complexity, installation costs, and future-proofability of the wooden floor. A private home’s floor assembly can be made affordably and securely using load-bearing beams installed on columnar supports in nearly any size. While floor repairs on the poles can be completed in a single day, fixing hairpins or a lengthy, massive suspension lag beam is more difficult.
In a private home, you can significantly lower the humidity and heat loss by placing a concrete pillow beneath the lags. The first steps will be to add sand and crushed stone to the space, apply a layer of insulation and waterproofing film, and then close the concrete with a 40–50 mm thickness. If there is a chance that the soil will seep into the underwear of rodents and the soil is soft, experts advise creating a screed.
Thermal insulating materials advantages and disadvantages
Private home owners typically use expanded clay, foam, or mineral wool to insulate their floors. These materials’ popularity can be attributed to a number of other benefits in addition to their democratic value.
The market for building materials today provides contemporary options that are pricey but also have many benefits.
Ceramzit
This is granular stuff with a clay foundation. It is very easy because of its finely porous structure. Its primary benefit is that it retains its insulating qualities even in the presence of moisture buildup. Unquestionably, expanded clay has the following benefits:
- good thermal conductivity;
- resistance to temperature differences;
- fire resistance;
- strength;
- durability (extends the life of wooden floors up to 50 years);
- environmental friendliness;
- Simplicity of installation.
It doesn’t take much steam or waterproofing to lay such a heat insulator.
The expanded clay’s heat-insulating layer should be at least 10 cm—and ideally, more than 50 cm—which is a drawback. The level of insulation will be insufficient otherwise.
Styrofoam
One of the most widely used heat insulators in residential construction is this one. The primary benefits of this material are its high heat and sound insulation. Since foam is made from a variety of raw materials, its density can vary. The greater the size of this indicator, the greater the resistance to mechanical stress and lower the level of thermal insulation.
Select a low-density material for the floor because it will be shielded by the finishing coat and black layer. The foam is long-lasting. There won’t be any different microorganisms in it. Using polystyrene for floor insulation in a private home is an easy process.
Foam has a number of drawbacks, such as a high fire risk from combustion, the release of toxic smoke, and rodent "love," which seriously damages the insulation.
Mineral wool
This material has evolved into a standard for wall, ceiling, and floor insulation over the last few decades. Discharge it as rolls, plates, or matting. It will last for at least thirty years if mineral wool is installed correctly. She is impervious to temperature changes and is totally fireproof. The key benefits of mineral wool are its low heat conductivity, excellent sound insulation, and simplicity of installation.
One drawback is the permeability of vapor. Excellent waterproofing is required before this insulation is installed. If not, mineral wool quickly loses its ability to retain heat as it becomes saturated with condensate and accumulates moisture.
Additionally, you must use protection against rodents who are not afraid to settle when using this material.
Foam
In the Russian market for building materials, there is a high demand for this material. General-purpose polystyrene is pushed to create foamed polystyrene, or foamyplex. Air-sealed air cells are created in it during the manufacturing process, and the material solidifies to take on a homogenous structure.
It stands out for its strength, longevity, and simplicity of installation. Its resistance to frost lets you use it in even the worst weather conditions. The foaming complex has a low heat conductivity because 1.5 m of brick masonry has been used in place of the insulation that was 5 cm thick. Its low absorption of moisture and vapor permeability are among its benefits.
Drawbacks: fear of extreme heat (melts), expensive, and "love" of rats.
Experts advise paying attention to the fundamental characteristics of the materials listed on the packaging when determining which insulation to use for floor insulation in private homes.
- The coefficient of combustibility (labeling G1 – the material does not burn without direct fire);
- The water absorption coefficient (indicated as a percentage, the lower, the less water absorbs the insulation and better retains insulating qualities);
- Thermal conductivity coefficient (material with a lower indicator is better insulating the floor);
- The density indicator will indicate how strongly the heat insulator hesitates the floor structure (the higher this coefficient, the more durable the black floor and overlap should be).
What are the black floors in wooden houses
- On the lags. Most often, they are used as a base for finishing flooring with low supporting indicators: laminated floors, linoleum, parquet board or piece parquet. In these cases, the draft floors perceive the loads and evenly distribute them over the floor area. Sometimes such floors are called the basis, such names are used by inexperienced builders, but has the right to life. Black floor installation scheme on lags
- Under the lags. In the lower part of the lag, cranial bars are recorded, they serve as the basis for attaching the draft floor, insulation and steam and waterproofing. Dry black floor
- On the bearing beams. In our opinion, the most successful option, but you need to think through it at the stage of designing a wooden house. Why do we think so? Bearing beams – photo distance between the beams of the ceiling ≈ 1–1.2 meters, specific values and values in thickness are calculated depending on the load. Then, lags with a distance of 40-60 cm are placed on the beams of the ceiling. Why do double work, it is much more advisable to install blocks of the ceiling a little more often, while reducing their size. The same beams will perform the function of the lag. What will happen as a result? Significant saving of materials. Paul floor beams if you calculate the number of beams for beams and lags in the traditional construction version, then the second option makes it possible to achieve savings at least 40%. At modern prices for natural quality (and for these works, lumber of only the highest quality are used) in monetary transfer, the savings are significant amounts. Another undoubted plus is an increase in the height of the interior, with a height of the lag within ten centimeters, this is a noticeable increase. The distance between the beams
You can use any low-quality material for the draft floor, unless it will be the foundation for installing the finishing flooring. Board pieces, OSP sheets, chipboard, plywood, and failed boards can all be included. It doesn’t matter how thick the materials are; one can use slabs or floorboards that are one to three centimeters thick. It will be covered with thermal insulation materials, so slight variations in the base’s height won’t affect them. Naturally, non-cunning boards should be replaced, as wood pests thrive beneath the bark.
Components of dark flooring
Protecting black floors from the damaging effects of moisture is the second crucial aspect. The antiseptics used in the implementation are currently quite effective and require at least two impregnations of the boards.
Important: Lumber needs to be dried before being impregnated.
The more antiseptics they absorb, the lower the relative humidity and the more dependable the protection.
Absence of antiseptic – not an issue. Simply ascend the boards to achieve the same result. Handle the ends of the black floorboards with extreme caution. One of the biggest errors made by inexperienced builders is their inattention to the details. They start by placing cut boards on the supporting components, brushing two surfaces only, ignoring the ends. Since all of the wood’s capillaries are open here, the ends of the wood absorb the most moisture.
Handling the tree using olipoi
And the final one. Remember that if there is insufficient natural ventilation in the subterranean of a wooden house, no amount of antiseptics will be of assistance. The original properties of a black floor will eventually wear off. Will need to replace all of the flooring in addition to him.
Install metal lattices on the vents if you are concerned about rodents getting inside. If you feel that the first floor rooms are unusually cold in the winter (which is possible), then close the doors during that cold spell. But make sure to use warming when opening each perfume. It should be noted that ventilation is necessary to ensure the longevity of the lower crowbar crowns.
The foundation’s device in the foundation
Sensible guidance. Check the efficiency with smoke or a lighter. Light a fire in the holes and observe the flame’s response to airflows, including its force. Insufficient airflow – promptly implement strategies to enhance ventilation effectiveness.
Where the fictions are actually located
Profitability of dialing black bases
Floors in a home made of wood
We hope you now know how to install a double floor base, lay flooring throughout the house, and perform high-quality insulation. Of course, installing the draft floor adds a significant amount to the overall cost of the project, but these costs will eventually pay for themselves. Experience has shown that this kind of insulation can reduce wintertime heating costs for buildings by 30%. Furthermore, this makes a major financial contribution to the family and provides solid support for the suggested plank flooring device.
And one final happy moment. The life of the finish coating is extended by a double base that is executed with quality. As a result, we construct floors in a wooden home using the plan that has been given. You are able to complete the task on your own using conventional and basic technology. The cost of the mentioned wooden structure will be significantly lower than that of other equivalents (concrete screed, for instance).
In fairness, it is worth talking about the shortcomings of the wooden black sex:
- Firstly, due to the rigidity of the structure, it is very poorly extinguishes shock noises.
- Secondly, double flooring cannot be used in rooms with high humidity (in baths, paired, soul).
Installation of wooden floors
When building a private home, many people choose to install wood flooring. The desire to use environmentally friendly materials—wood being one of them—explains why people would want to walk on a high-quality wooden floor. Such a floor has several benefits in addition to being very environmentally friendly.
While in use, wooden floors are simple to install and maintain. Owing to the material’s low thermal conductivity indicators, this kind of floor will keep heat inside the house and prevent it from leaving. High-quality wood plank floors stand out for their lengthy lifespan and appealing "natural" look.
Selecting the proper wood is essential when installing flooring in a private residence. The initial material selection should take into account the structure’s design elements. The country house’s flooring must unavoidably allow for the existence of an underground space that serves as an air gap. The lack of such a layer will cause the wooden floor to become unusable due to moisture exposure very quickly.
Furthermore, all structural layers—lags, black flooring, hydro- and thermal insulation, finishing coating—must be present for a satisfying sexual encounter.
A private home’s floor is subjected to a lot of mechanical stress, so when building it, wood with good technological qualities must be used. It is advised that the boards be thoroughly dried, with a maximum moisture content of 12%. It is unacceptable for the material to have any chips or cracks on its surface. Coniferous wood, such as pine, larch, fir, and cedar, is preferred by experts. All of the boards need to be treated with an antiseptic and an antipyrene to extend the life of the future floor.
Selecting locations for supporting pillars and installing them is the first step in installing a wooden floor. The entire perimeter of the house is stripped of its rich soil layer, which is replaced with gravel and covered in sand. Sand and gravel layers must be firmly compacted. On the ends of the support pillars, waterproofing material is applied; typically, ordinary roofing material is used for these purposes.
Putting gravel inside.
Next, we create beams with metal corners that must be fastened to the pillars. Double insulation works best for floors in private homes. Experts advise laying plywood sheets from the sides of the beams first, and then covering them with mineral wool or another insulating material.
Once the insulation layer is complete, you can move on to the black coating’s flooring. This layer’s boards should fit together nicely, and you can use standard self-tapping screws to fasten them to the beams. It is best to leave a specific space between the floor and the walls of the home; for this area of the floor, a 1.5 cm slot can be thought of as the standard. These openings allow air to circulate throughout the floor structure and shield the walls from the expansion of the flooring boards during the drying process.
Over a black floor is a layer of vapor barrier made of 200 micron-thick polyethylene film. Separate film pieces must be joined at the joints using tape, and the edges must be wrapped around the walls to a height of approximately 20 cm, or the height of the finished coating. You can move on to the assembly of the last sex after the film has been laid and fixed.
The last floor is put together using boards cut from a variety of plywood sheets. Although plywood sheets are simpler, they don’t seem as good in the end. Therefore, it is best to get a finished coating from a dodger as soon as possible if you want to keep your home’s wooden floors, and to just fix the plywood sheets if you want to close it off with decorative material. After the final floor is assembled, the dumped floors must be varnished. This will highlight the natural wood’s decorative qualities while shielding the material from mechanical and chemical external influences.
Concrete floor
When a house’s walls are made of brick or cinder block, the device of that kind is relevant.
When a house’s walls are made of brick or cinder block, the device of that kind is relevant.
- In a private house around the entire perimeter (living rooms, kitchen and utility rooms) remove soil 5 cm thick. The base is well aligned and touched, slightly moisturized with water.
- A layer of sand is poured on top, which is also a little moisturized and tamped. Let the layers of the pie dry.
- Now you can fill in a black screed involved in gravel or expanded clay instead of sand. It is poured on the sand and aligned well. They give completely to dry.
- A waterproofing layer is laid on a black screed. It is better if it is a roofing material, but you can use an oilcloth 250 microns. All joints are connected with tape, and the edges of the coating are thrown onto the walls of the foundation.
- For floor insulation in all rooms, including in the kitchen, we should be laid a heater (expanded clay or extruded polystyrene foam).
- After this layer of the pie on the floor, the reinforcement is laid and the device is made by the finish screed. It is aligned on the established beacons and dried for at least a month.
Important: You can lay any kind of flooring, including laminate panels or wooden boards, on the screed that is set up in this manner in the cottage.
Brand Coating in a private house
Next, let’s look at how a unique self-leveling mixture can be used to create a floor in a private home. This technique of applying coatings to suburban buildings has gained a lot of popularity recently. It is much simpler to create than a concrete floor, and bulk coatings can be much more aesthetically pleasing than cement screeds.
How then do you create a filling floor in a private home? The following is how this operation is executed:
- A concrete base is made. The method of its filling is no different from the above.
- The surface of the finished screed is drained. If the concrete floor was poured for a long time, it will most likely have to correct it.
- The surface of the surface is performed.
- With the help of a perforator, a bulk mixture is diluted with water.
- The solution is applied to the primed base in small portions and is thoroughly aligned.
- Immediately after pouring each portion, the solution must be passed with a needle roller to remove bubbles.
Wrap plastic wrap around the completed floor. He should strengthen himself in this situation.
As you can see, using a self-leveling mixture is a great way to address the issue of how to construct a floor in a private residence. Pictures of this kind of coating with a three-dimensional design, shown a little bit below, amply illustrate its dependability and beauty. Such a coating is attainable, even with your own hands.
Laying a wooden floor
In private homes, a wooden floor is frequently chosen for the coating. Its pure environment is the reason for this. Many people desire a superior wood coating. These floors have a variety of noteworthy benefits.
A wooden floor can be used for decades without losing its physical qualities or appearance with proper processing. Wooden floors also offer excellent thermal insulation qualities. They infuse the home with comfort. Additionally, you use your own hands to install the wooden flooring. You’ll need to get a standard tool set ready for work.
It is important to choose a wood variety carefully before laying flooring in a private residence. It ought to be chosen based on the kind of structure. Paul is organized in multiple levels. Both waterproofing and heat should be present. The air gap is acted upon by the underput. Wooden components won’t be exposed to moisture as a result. They won’t get fungus or mold on them.
During operation, mechanical loads are applied continuously to the sexual coating. For this reason, the wood that will be used for the floor needs to have high-quality technical indicators. Prior to covering the board, it should be allowed to dry. Wooden components shouldn’t have more moisture than 12%.
Visually examining the components of the future sex is also worthwhile. They shouldn’t have any cracks or chips on them. If not, this might have an impact on the coating’s quality. Furthermore, antiseptics and antipyrens are applied to wooden elements prior to laying. This will increase the products’ service life.
The following order is followed when installing a wooden floor:
- First you should determine the installation sites of the support. Gravel should be filled in the place of cleaned soil. Sand falls asleep on top. So the pillow is performed. Each layer should be thoroughly compacted. The ends of the support pillars are wrapped in waterproofing material. Typically, roofing material is used for such a purpose.
- After that, the beams should be laid. And attach to the supports using corners and screws. Floors in the country house should be carefully insulated. Professional builders recommend laying plywood sheets before installing the insulation. Mineral wool is usually used as insulation material.
- When a layer of insulation is laid, you can begin the performance of a rough flooring. The boards should be chosen so that they fit tightly to each other. Self -tapping screws are used to connect them to the beams. About 1.5 cm is left between the draft floor and the walls. Such gaps make it possible to exclude the distortions of the structure during thermal expansion.
- Vapor barrier is laid on the black floor. She usually has a thickness of 200 microns. The joints of the canvas are glued with construction tape. The edges of the vapor barrier are started on walls to a height of 20 cm. After laying the film, you should start laying the finish coating.
Boards from the array are utilized for the last floor. Plywood sheets can also be employed. It is much simpler to fix them. But there’s a lot about their appearance that needs improvement. It is therefore preferable to select the downshole boards. Plywood can be finished with a variety of artistic embellishments. Pauls from boards are typically varnished. By doing this, you can shield the coating from different types of damage. Additionally, you can highlight a wooden floor’s aesthetic qualities by applying varnish. In the case of building a concrete screed, you can construct a warm floor yourself.
Black floor for soft flooring
It assists in aligning the lags or concrete bases in addition to distributing the loads on the surface evenly. These types of floors are used for linoleum, laminate, and piece and parquet flooring. When using materials like fiberboard plate, plywood, or OSP, they must all be waterproof.
It is advised to use construction glue to attach the draft floor’s concrete bases.
Glue-mounting plywood
The screed needs to be level, with a height variation of no more than ± 2 mm.
On the screed, a black floor can be laid either straight onto the base or on the rails. The first approach is used when there are noticeable irregularities in the base; in these situations, additional insulation or engineering networks must be laid beneath the floor.
Using a layer of insulation and plywood
The lags’ plywood floor
It is far simpler and quicker to align the concrete coating with the aid of rails than it is to create a second screed using cement-sand mixtures. Waterproofing must be installed between the slats and the screed; the height of the rails must be aligned with different lining and fastened with dowels. Cloves are used to secure black floor slabs, and plate sizes need to be adjusted according to the space between slats. Two slabs are fixed on the side faces at the same time, and they should be positioned in the center of the rails. Make sure that the sheets are not positioned to pretend to be in four corners in one area as this may cause the finished flooring to swell.
Plan for installing plywood on wooden lags
Even grounds that don’t need extra insulation can use the second method of laying a black floor on screed. Construction adhesive may be used to create the ideal surface. The draft floor is smoothed with a comb beneath the slabs, eliminating any small lumps, forming a single, screeded monolith. Moreover, the materials used affect the floor device algorithm.
Ply
To achieve this, special or homemade arresters are used, and the metizes’ heads must be fully shed. If the black floor is going to be covered with linoleum, it is advised that an electric machine be used to polish the entire surface.
Joint locations should receive special attention; abrupt changes in height are not permitted in this area.
Verifying the uniformity of the plywood installation in the picture
The holes in the dowel hats are sealed.
Plywoodmade of plywood
Always remember to leave 1-2 centimeters between the wall and the draft floor. Place fragments of any heat insulator in these areas to prevent the appearance of stroke bridges.
Video – Black Paul Construction
Finishing
Any sex has decorative decoration in its design.
There are various materials that can be used for this:
- Installation of the board. This is the main option for arranging wooden floors. Before covering it, wood should be treated with special compounds. They will protect it from premature decay and damage to microorganisms. When installing the boards, it is important to carefully adjust its dimensions to get joints without cracks.
- Laying of laminate or parquet. Their installation is carried out only on perfectly even grounds. If the floor is formed from the lag, then you need to leve it with plywood, boards or other similar materials. After that, a substrate is laid, on which lamellas are joined with each other. When old floors are used for installation, it is important to check their condition. If necessary, it is desirable to block the damaged areas so that the parquet does not bend over time.
- Tile finishing. This option is suitable for bathrooms where high humidity is present. Installation is performed on cement solutions, which are well grasped with tiles. The material is suitable only for concrete bases.
- Using roller products. This includes linoleum and all similar materials. They allow you to get a beautiful surface, but at the same time require a strong substrate. You can use them with any reason.
Paul device diagram
Installing a black floor scheme on lags
Methods of installation of a summer cottage
There are two structural options for mounting the floor.
Standard components of a hardwood floor
- If possible, the lags are based directly on the foundation. Sometimes for this purpose a special embedded crown is laid out. In this case, the half is tightly attached to the frame of the house and with it experiences seasonal fluctuations.
- If you put the lags on the foundation or the elements strictly connected with it is impossible, then an independent floor is installed, which lies without binding to the main structure of the house. They do this, laying each lag on the columns. This technique is allowed only on stable and sedentary soils. Dry black flooring on the lags
A number of considerations should be made when choosing which floors are ideal for your private residence. The local climate is one of the most important factors. The comfort and energy efficiency of your home can be greatly increased if you choose insulated flooring if you live in a colder climate, such as an area that experiences harsh winters. Warmth is retained in your home and heating expenses are decreased with the help of insulated floors.
The intended use of the space is another crucial consideration. Hardwood or tile are good choices for high-traffic areas like the kitchen or living room because they are long-lasting and easy to clean. These materials are perfect for spaces where spills and messes happen frequently because they are stain and wear-resistant and can tolerate repeated cleaning.
Carpet flooring can offer a warm and comfortable sensation underfoot in bedrooms and other spaces where comfort is a top priority. In addition to providing insulation, carpeting also helps to keep interior temperatures comfortable all year long. When selecting carpet flooring, it’s crucial to take things like allergies and upkeep requirements into account.
Budget is a major factor when choosing the right flooring for your private home, in addition to climate and intended use. Even though they may cost more up front, materials like tile and hardwood frequently provide long-term durability and aesthetic appeal, making them an excellent investment. Conversely, less expensive alternatives such as vinyl or laminate flooring can offer a comparable appearance at a lesser cost.
The ideal flooring option for your private home will ultimately depend on a number of variables, such as the climate, the intended use, and your budget. You can choose the flooring option that best meets your needs and tastes by carefully evaluating these factors and the benefits and drawbacks of each one, guaranteeing a cozy and welcoming living area for years to come.