Hydraulic tests of the heating system

Greetings and welcome to our guide on heating system hydraulic tests! Hydraulic tests are an essential part of making sure your home’s heating system is long-lasting and efficient. These tests aid in locating possible problems, leaks, and inefficiencies in the system, enabling prompt fixes and enhancements.

Particularly in the winter months, heating systems are essential to keeping our homes cozy and warm. But over time, a number of elements, including deterioration, rust, and sediment accumulation, may have an impact on how well these systems function. Hydraulic tests are useful in this situation as preventative measures to find and fix any underlying problems before they get worse.

In hydraulic testing, the performance of the boilers, radiators, valves, pipes, and other heating system components is evaluated along with their flow and pressure. These tests help to optimize the system’s operation and offer important insights into its functionality by simulating real-world conditions.

The capacity of hydraulic testing to identify leaks and weak points in the heating system is one of its main advantages. If neglected, even minor leaks can result in considerable energy loss and water damage. Experts are able to find these weaknesses and put suitable fixes in place to stop additional harm through rigorous testing protocols.

Additionally, homeowners and HVAC professionals can adjust the system for maximum efficiency with the help of hydraulic tests. Adjustments to improve performance and lower energy consumption can be made by measuring parameters like flow rate and pressure drop. This lessens the impact on the environment and lowers utility bills in addition to increasing comfort levels.

Methods of testing of heating systems: hydraulic, thermal, pneumatic

The heating system should function dependably in addition to being efficient. It is vital to select the appropriate installation circuit, parts, and consumables in order to guarantee this. The rules state that the testing of the hydraulic, thermal, and pneumatic heating systems constitutes the last installation or launch event.

Purpose of heating tests

Checking the central heating system

Since the check can reveal both obvious and hidden defects, it ought to be a mandatory procedure. However, what is the correct way to test the heating system, either thermally or hydraulically? You should get in touch with the normative document SNiP3.05.01-85 to accomplish this.

It doesn’t provide a clear process for carrying out these actions. Nonetheless, a link to GOST 25136-82 exists, which outlines guidelines for getting ready for the internal heating system’s hydraulic tests. These actions need to be taken for central heating as well as autonomous systems. These are the uses for which they are meant:

  • Preliminary check of all elements of the scheme before launching. Minimizing the likelihood of breakdown of individual nodes;
  • Control of compliance of the finished system with the calculated parameters – temperature regime, pressure and thermal load;
  • In some cases, it is necessary to show representatives from state structures an act of testing the thermal effect of heating systems or another document confirming the fact of verification.

There is a specific process for which the test order is defined. First, a set of hydraulic tests is conducted on the internal heating system; these tests can be substituted with pneumatic (bubble) ones. The protocol for the thermal analysis of the heating system’s operation is the last one.

You must finish the system’s initial calculation before moving on to the heating tests. The system needs to be tested further to identify the best pressure indicators, which can only be found in this manner.

Hydraulic heating test

Hydraulic examination of the heated floor

This process actually involves filling the system to check for tightness. Hydraulic exposure, as opposed to air heating system testing, indicates how prepared the machinery and parts are for the winter.

The following prerequisites must be met in order to perform a hydraulic test on the heating system:

  • Environmental temperature should be more than +5 ° C;
  • The connection of the pumping equipment for filling the system is located in the lowest part of the circuit – in the return pipe;
  • If the pipes are closed in some sections of heating, it is necessary to temporarily remove protective panels for visual control of the filling of the system.

Act of Hydraulic Testing

A hydraulic check is performed on the central heating system 1.5–2 months prior to the onset of the heating season. Collectors are opened in the multi-story building’s supplying node, which is where the pipeline is filled. Elevator nodes are used to adjust pressure. The internal heating system’s hydraulic verification process is the last step of testing.

Only management company representatives should be involved in test implementation and act preparation. However, locals are entitled to request a copy of the record.

Pneumatic heating test

Test of pneumatic heating

The primary requirements for a hydraulic test of the heating system may not always be met. After the repairs, in the winter, when it will be below +5 °C, a similar situation might arise. Next, you ought to draft a pneumatic testing procedure for the heating system.

Its main purpose is to heat highways by applying a pressure of 100 kPa. In this instance, the decrease in pressure should not be greater than 10 kPa in ten minutes. Use pressure gauges with a division price of no more than 5 kPa and a class of 2.5 accuracy to check this. When testing the heating system pneumatically, all equipment characteristics could be present.

Such inspections are not advised for polymer pipelines. Nonetheless, the following situations permit the standards to test metalloplasty or polypropylene air heating systems:

  • Technical conditions do not allow filling with fluid. Most often this is due to the use of antifreeze;
  • Environmental temperature below 0;
  • Temporarily there is no coolant in the required volume.

Finding areas where there is a loss of tightness is the primary challenge when testing the system aerially. It is advised to conduct a zonal check of the plots if a sudden drop in pressure was observed during the process. There is no other method for locating a potential leak. As a result, they find the hydraulic approach to be more practical.

Creates a pneumatic heating system testing act at the conclusion, inserting the findings into it.

It is advised to fill out the adopted form in order to ensure proper act preparation. They can be taken on the management company’s website or in its office.

Thermal heating test

Thermal inspection thermometer

The uniformity of heating across all radiators and batteries will be assessed by timely thermal testing of the heating systems. In contrast to the documents mentioned above, it is advised that this process be followed consistently and for independent schemes.

These tasks aren’t done annually for central heating. Only in the following situations is the act pertaining to the heating system’s thermal tests drafted:

  • The introduction of the system into operation;
  • Replacing most of the components with new ones, a change in pipelines configuration.

Before the heating period, a trial launch is frequently combined with the heating system test. Turning on the boiler and adding coolant to the pipelines is insufficient to accomplish this. It is advisable to start by clearing the system of any accumulated debris and lime plaque. The heating system’s thermal tests will be inaccurate if this isn’t done. The thermal conductivity of pipes and radiators will be impacted by extraneous materials, directly affecting the energy return on those components.

Combining thermal and hydraulic checks is the best option. Thus, it is possible to stop air traffic congestion from occurring.

Central heating

Thermal analysis of central heating

Filling out an act of testing the thermal effect of heating systems is done in accordance with guidelines for centralized schemes. First and foremost, the water needs to be heated to a temperature of +60 °C.

The audit should take at least seven hours to complete. Individual parts are changed concurrently to balance the nodes’ temperatures. This is demonstrated in the act for the heating system’s thermal tests. In apartment buildings, general indicators with similar ones in the elevator node are made, and separate measurements are made for each riser.

The thermal test procedure

What benefits do homeowners receive when they test the heating system for warmth?

  • Verification of the actual heat supply indicators with declared from the management company;
  • With the installed metering and adjustment device for the receipt of the coolant (in the elevator node) – the ability to determine the optimal mode of operation of the system;
  • Timely detection of air traffic jams.

These tasks must all be completed by the management firm. The heat supply contract makes this clear. Testing the central heating system’s thermal impact will be the audit’s outcome.

When conducting thermal tests on the heating system, the room’s temperature is considered in addition to the radiators’ and pipes’ level of heating.

Heating system

One instrument for thermal testing is the thermal imager.

It’s also essential to test an autonomous heating system for heating. It is possible to anticipate the locations of a significant temperature differential while carrying out this process. Batteries and radiators can have their operating modes changed with the use of adjusting reinforcement.

In actuality, an act of testing the thermal effect of heating need not be drawn up for autonomous schemes. However, it is best to accept the central heating technique in order to determine the sequence of action. It’s possible that the measurement techniques differ:

  • The degree of heating of the heating elements is checked by the installed thermometers or according to the indications of the thermal imager;
  • The room temperature is controlled using external sensors.

The effect of low temperatures on the street, however, will not be considered during the summer. As a result, in addition to the signs listed above, you also need to consider the house’s level of thermal insulation and thermal losses.

Recall that there are specific methods for conducting heat-system tests (thermal, hydraulic, and pneumatic), each of which must be followed. The kind of heating system and outside variables determine this.

The video content describes the characteristics of an apartment hydraulic heating test:

In the article on "Hydraulic tests of the heating system" for our website dedicated to heating and insulation of houses, we delve into the crucial process of checking the functionality and efficiency of a home"s heating setup. Hydraulic tests play a pivotal role in ensuring that the heating system operates optimally, identifying potential issues such as leaks, blockages, or inadequate pressure. By conducting these tests, homeowners can pinpoint areas for improvement, enhance energy efficiency, and ultimately save on heating costs. This article will guide readers through the importance of hydraulic tests, how they are conducted, common problems they uncover, and the benefits of regular maintenance in keeping the heating system running smoothly throughout the year.

Hydraulic tests of pipelines of heating systems

February 28, 2016

The population’s peaceful and regular wintertime existence can only be guaranteed by a well-functioning heating system. Extreme circumstances of all kinds can occasionally arise, where the system’s performance can diverge greatly from that of everyday life. Pipeline hydraulic tests and crimping are required to avoid potential problems during the heating season.

The goal of hydraulic tests

Any heating system typically operates in standard mode. The coolant working pressure in low-rise buildings is typically 2 atm, 5-7 atm in nine-story buildings, and 7-10 atm in multi-story buildings. The pressure indicator in the subterranean heat supply system can reach 12 atm.

Unexpected pressure spikes can occasionally happen, which causes the network’s level of it to rise. Consequently, a hydraulic blow takes place. Heating pipelines must undergo a hydraulic test to ensure that the system can withstand hydraulic shots in addition to being able to operate under typical, normal operating conditions.

For whatever reason, if the heating system was not inspected, there could be catastrophic hydraulic events that result in boiling water, furniture, equipment, etc. in the bay.

The sequence of work

Pipeline hydraulic tests ought to be performed in the following order.

  • Cleaning pipelines.
  • Installation of cranes, plugs and manometers.
  • Water and hydraulic press are connected.
  • Pipelines are filled with water to the required value.
  • Pipelines are examined and a mark of places where defects were discovered.
  • Elimination of defects.
  • Conducting a second test.
  • Disconnecting from the water supply and the descent of water from pipelines.
  • Removing a plug and pressure gauges.

Preparatory work

Prior to conducting hydraulic testing on heating system pipelines, all valves must be revised and their seals filled. Pipeline insulation is inspected and repaired. Plugs are required to isolate the heating system from the main pipeline.

Water is added to the heating system once all required adjustments have been made. Excessive pressure is generated with the use of pumping equipment; the worker’s indicator is about 1.3–1.5 times higher. The heating system’s pressure should remain for an additional half-hour. In the event that it has not decreased, the heating system is operational. The inspection of heating networks is done in order to accept the results of hydraulic tests.

Strength tests and tightness

Pipeline preliminary and acceptance hydraulic tests (SNiP 3.05.04-85) need to be performed in a specific order.

  1. In the pipeline, the pressure increases to the test (pAnd ) by pumping water and maintained for 10 minutes. It is impossible to decrease pressure above 1 kgf/m 2 (0.1 MPa).
  2. Test pressure is reduced to calculated (pR ) internal, then it is supported by pumping water. Pipelines are examined for defects over the time required to carry out this inspection.
  3. Detected defects are eliminated, after which a repeated hydraulic test of the pressure pipeline is performed. Only after that can you start testing for tightness.

Tightness

  1. In the pipeline, the pressure increases to the testing indicator for tightness (pG ).
  2. Fixed the start time of the test (tn ), the initial water level is measured in a measured tank (hn ).
  3. After which it is monitored by reducing the pressure indicator in the pipeline.

Think about the following three possibilities for the decreasing pressure magnitude.

You can conclude the observation if, over the course of ten minutes, the pressure indicator drops by less than two manometer scale marks without falling below the computed internal resistance (pR).

In this scenario, observation of lowering the pressure to the internal (pR) calculated must continue until the moment it falls no less than 2 marks of the manometer scale. This applies even if the pressure value decreases after 10 minutes by less than 2 marks.

Pipes made of reinforced concrete should be observed for no more than three hours, while pipes made of cast iron, steel, and asbestos-cement should be observed for one hour. Water is released from pipelines into a measured tank if the pressure does not drop to the calculated pressure ratio (pR) within the allotted time.

Further hydraulic testing of heating system pipelines must be halted, and steps to remove hidden defects by keeping pipes under internal calculated pressure (pR) must be taken, if after 10 minutes the pressure falls below the internal calculated (pR). Defects will not be found until after a careful inspection, which will result in an intolerable pressure drop in the pipeline.

Determining the additional volume of water

The following needs to be completed following the first option’s observation of the pressure indicator dropping and the second option’s cessation of the coolant discharge.

  • Using pumping from a measuring water tank, the pressure in the pipeline increases to the indicator during hydraulic tests (pG ).
  • The time should be remembered when the test for tightness has ended (tK ).
  • Next, it is necessary to measure in a measured tank the final level of water h hK .
  • Determine the duration of pipeline tests (tK -Tn ), min.
  • Calculate the volume of water pumped from the measuring tank Q (for the 1st option).
  • Determine the difference between the volumes of water pumped up and discarded from pipelines or the amount of additionally pumped water Q (for the 2nd option).
  • Calculate the indicator of the actual consumption of additionally pumped water (Qn ) according to the following formula: Qn = Q/(tK -Tn )

Drawing up an act

Hydraulic testing of pipelines is proof that all the work was completed. This record, created by the inspector, attests to the fact that all standards and guidelines were followed during the project and that the heating system withstood them with success.

There are two primary approaches for performing hydraulic tests on pipelines:

  1. Manometric way – tests are carried out through pressure gauges, devices that record pressure indicators. During operation, these devices show the current pressure in the heating system. The conducted hydraulic tests of pipelines through the manometer allow the inspector to check what pressure indicator was during testing. Thus, the operating engineer and the inspector check how reliable the tests are.
  2. The hydrostatic method is considered the most effective, it allows you to check the heating system for performance at a pressure that exceeds the average working indicator by 50%.

Different parts of the system are tested at different times, and pipeline hydraulic tests cannot be completed in less than ten minutes. An indicator of 0.02 MPa is thought to be a reasonable pressure drop in heating systems.

The primary prerequisite for the commencement of the heating season is the successful completion of appropriately planned and skillfully executed hydraulic tests of pipelines (SNiP 3.05.04-85), in compliance with the specifications of relevant regulatory documentation.

How hydraulic tests of pipelines of heating systems are carried out

The purpose of hydraulic testing on heating system pipelines is to verify their strength. The test plot is checked as a result of this procedure’s use of a pump, which produces excessive water pressure.

Features of the procedure

If individual system sections are replaced prior to the start of the heating season, the system’s test is still accepted. Prior to the commissioning of real estate objects, following repairs. Pipelines undergo both preliminary and final testing following installation.

The system reliability can be verified with the final check, while the installation quality is assessed with the aid of preliminary tests. Locksmiths complete these tasks prior to doing finishing work.

1.25 worker pressure is used when testing hydraulic heating systems; however, systems with steel heating devices cannot use pressure levels higher than 10 bar. When testing a system with cast iron radiators, the pressure shouldn’t go above 6 bar. Leaks can be found during the checking process and fixed right away. Samples are repeated until a satisfactory result is achieved.

The purpose of testing the new heating systems was to find any inconsistencies in terms of density, lack of tightness in the junctions and existing formations, and component marriage. Water flow will occur in the presence of flaws and weak spots, so it is crucial and important to identify mistakes up until the point of operation.

The flow through the pipeline has the potential to abruptly stop the entire heating system in an emergency.

Hydraulic tests of pipelines of heating systems, their varieties

Different types of hydraulic checks exist, including:

  • Heating systems, heating;
  • Sewage;
  • Water water supply.

Hydraulic water supply system testing is done up until the water clearance reinforcement is reinforced. Water is used to test the system for ten minutes at a pressure equal to the worker plus 0.5 mpa. Pressure indications cannot drop by more than 0.1 MPa using this procedure. The tests are conducted in low-temperature environments because the heating system is being launched.

Internal water heating systems are usually checked by the flow of water, whose pressure is 0.1 MPa higher than the working one. At the lowest system of the system, the test pressure is set to be at least 0.3 MPa. It is required to shut down the expansion vessels, the boilers, and every heat point in order to perform tests.

All of the air that is present inside the system must be evacuated before adding water to it.

When the manometer indicators show a decrease of no more than 0.02 MPa over a 5-minute period, the system is ready to be activated.

If the system is tested, works from district thermal power plants, then the level of pressure is coordinated with the administration of the TPP. In conclusion, the heating system should be checked for the production of thermal energy, during which the final regulation of each heating device of the heating system occurs.

Tests should be conducted in rooms with insulation during the colder months. This system is being gradually filled with hot water, but no hydraulic testing is being done. The system can be put into service after three months of continuous operation.

Hydraulic test act of the heating system

Following the completion of all required test-related actions and manipulations, a document is created that includes the most comprehensive and detailed information regarding the outcomes of all manipulations. The heating system’s hydraulic testing is a record that attests to the test system’s flawless condition and operational suitability.

Test Type Results
Pressure Test System held pressure of X psi for Y hours without significant drop.
Flow Rate Test Flow rate measured at Z gallons per minute under operating conditions.

It is crucial for both cost-effectiveness and comfort that your home’s heating system is dependable and efficient. In this process, hydraulic tests are essential because they provide important information about the integrity and functionality of the system. These tests save time and money in the long run by enabling the identification of possible problems before they worsen by mimicking real-world conditions.

The capacity of hydraulic tests to find leaks and inefficiencies in the heating system is one of its main advantages. Early detection can stop additional damage and keep the system operating at its best, regardless of how big the leak or how little pressure is lost. This proactive approach minimizes environmental impact and increases comfort while consuming less energy.

Moreover, by guaranteeing the security of their heating system, hydraulic tests give homeowners peace of mind. For example, identifying leaks in gas or oil pipelines can help avert dangerous scenarios like carbon monoxide poisoning or fire hazards. Regular testing and maintenance can help homeowners reduce risks and protect their property and loved ones.

Hydraulic tests also function as a diagnostic tool to maximize the heating system’s overall performance. Through the evaluation of variables such as temperature distribution, pressure levels, and flow rate, technicians are able to optimize the system’s performance. This optimization prolongs the life of the equipment and increases comfort levels while lowering the need for expensive maintenance or replacements.

To sum up, hydraulic testing is crucial to keeping your home’s heating system safe, dependable, and energy-efficient. These tests aid in cost savings, environmental sustainability, and general peace of mind by promptly identifying and resolving problems. A proactive approach to guaranteeing your home heating system’s comfort, safety, and longevity is to invest in routine maintenance and testing.

What type of heating you would like to have in your home?
Share to friends
Anna Vasilieva
Rate author
vDomTeplo.com
Add a comment