How to correctly fill a closed -type heating system

Comfort in your home is largely dependent on having a properly heated space, particularly in the winter. Making sure a heating system is correctly filled is essential to maintaining its efficiency, especially if it runs on a closed system. Maintaining a warm and energy-efficient home requires knowing how to correctly fill a closed-type heating system, whether you’re a first-time homeowner or trying to make the most of your current heating configuration.

Closed-type heating systems are sealed, which means that they work with a fixed volume of water circulating through pipes and radiators, in contrast to open heating systems, which depend on a continuous supply of water from a header tank. Numerous benefits come with this closed-loop design, such as less chance of contamination and more accurate water pressure control. But it also means that for best performance, it is essential to make sure the system is correctly stocked.

Making sure that every part of a closed-type heating system is leak-free and in good working order is one of the first things to do when filling it. Over time, even a tiny leak can result in pressure loss, which can impair the system’s effectiveness and possibly cause harm. Before filling the system, check for leaks or corrosion in the pipes, valves, and radiators. Take care of any problems found.

Eliminate any trapped air in the radiators and pipes before adding water to the system. Cold spots and inefficient heating can result from air pockets obstructing the flow of water. Open the bleed valves on each radiator, working your way up to the lowest point in the system, to remove any trapped air. You’ll hear a hissing sound as air escapes. Once the valve is consistently releasing water, shut it off to contain the water.

It’s time to add water after the system has been cleared of air. To connect the system to the main water supply, use an appropriate filling loop or filling link. When connecting the filling equipment, be sure to adhere to the safety instructions and manufacturer’s instructions. Open the valve gradually to let water enter the system gradually and avoid pressure spikes that could harm components.

How to fill out a closed heating system with any type of coolant

How to fill and turn on the closed-type heating system is a crucial question that comes up after the heating devices are installed. Although its features cause common difficulties for average users, the process itself is straightforward. These consist of the coolant pressure and upholstery point selection.

Open and closed heating systems: the principle of filling

An expansion tank is installed at the upper point of the open system. The solewood liquid’s surface is in direct contact with the surrounding air. One feature of the closed system is a membrane expansion tank that is completely sealed off from the outside environment.

Any kind of heating system can be filled with the following:

  • tap water supplied to the lower point of the system – through the feed valve;
  • water (distilled) or antifreeze, supplying liquid from the container (well, reservoir):
  • manually with manually and/or by means of a pump to the top (a fitting under the air vent or through an open expansion tank);
  • pumping by the pump through the lower point – the subfront input.

A lot of homeowners are aware of the easiest (and worst!) method for adding water to open systems using an expansion tank. Intermittently pour water or antifreeze inside to allow for the release of air. It is not advised to repeat this procedure in closed systems with the upper air vent nozzles. After initially filling the system, the air dissolves in the poured water after passing through a layer of it. You will be guaranteed air plugs that stop water from flowing through radiators and pipes.

When the closed-type heating system is being filled? It is advised to use the lower feed valve to supply fluid under pressure (from the water supply or container through the pump) into any heating system.

Where the heating system is located.

When the coolant is filled

There are just two circumstances in which this technological operation must be used:

  • starting heating into operation (at the beginning of the heating season);
  • Repeated start after repair work.

In late spring, water-beam water is usually drained for two reasons:

  1. Water is inevitably polluted by corrosion products (inside radiators, metal -plastic and polypropylene pipes are not subject to it). Leaving the old water for the new season, you risk breaking the circulation pump with solid pollution.
  2. Unlocked flooded systems of country houses can “defrost” with sudden cooling – such cases are not uncommon.
    In this sense, the coolant-antifreeze is preferable. The qualitative composition has high anti-corrosion properties that increase the "interlocal" interval to 5-6 years. Cases of uninterrupted operation of heating on the same volume of antifreeze 15-17 years are known. Low-quality antifreeze is recommended to be drained after 2-3 years.

Adding antifreeze to a heating system in a quantity.

Filling technology: where to serve the coolant

The capacity and pump are essential components as they generate the necessary pressure in the liquid coolant. Submissive varieties of "baby" or "dwarf" plants, which are well-liked by gardeners, are excellent choices for watering areas that are above reservoir levels. There is proof that manual pumps can fill closed systems successfully. These pumps can be used for specialized tasks like pumping liquid chemical products or motor fuels from barrels, or they can be used to spray protective solutions on garden crops. By using the manometer to control the pressure, any heating scheme can be filled in with success.

Antifreeze is added to the system using a submersible vibration pump.

The first operation is the choice of a fluid entry point. If the pressure created by the pump lifts the liquid to the top of the system, it should be connected at the lower point of the boiler room – the feed pipe with the coolant cut in front of the boiler into the “return”. In addition to entering the recharge, a separate drain output is necessary (two different system nodes). The first is equipped with a valve (ball valve) and a check valve, the second – only a valley (ball crane). If the lower point of the system is a fitting of water drain from the boiler, then you can lower/fill the system through it with water. Since the check valve is not installed behind the boiler drain (generally behind the draining), any offset of the pump will entail the flow of the processed fluid – you need to quickly block the tap in front of the fitting.

The typical plum unit/subtract’sdesign.

We fill out the system from below

Now let’s get back to adding fluid to the system. We employ the capacity of an appropriate volume (a 200 l plastic barrel works well). We reduce the pump’s pressure until it reaches 1.5 atm, the maximum pressure needed for the fluid to download (usually between 1 and 1.2 atm). A pressure pump that can withstand such pressure must be 15 m in size (it can reach 40 m in a submersible "baby").

After adding water to the barrel, we turn on the pump and check the fluid level while positioning it correctly above the input pipe to avoid "configuration." After lowering the level, we add water. In order to avoid submerging the loading pump case in liquid and failing to wash it, the antifreeze should be pumped from a bucket with a smaller capacity, just dear the input pipe. Antifreez will need to be added frequently, with intermittent pump shut-offs.

Using replacement water collection containers, Maevsky open cranes are used to fill the system on heating radiators that have been installed. Вогда жидкость пойдет из всех воздухоотводчиков, краны закрывают краны, продолжая процесс закачки.

The boiler device is appropriate for controlling the pressure on the pressure gauge. We fill the system and monitor the point at which the required pressure is reached while keeping track of its value when it surpasses the hydrostatic equal to the pressure in the liquid column height from the lower to the upper point of the system (height 5 m gives static pressure of 0.5 atm).

"Baby" slender antifreeze pump.

After the system is filled, the pump should be turned off, the air cranes opened (the pressure will eventually drop), and the water pumped up. We move the air bubbles around by repeating the procedure multiple times.

The system is now fully stocked in case there are leaks. The liquid is under pressure once the pump in the hose that is attached to the output pipe has been turned off. If the antifreeze is pumped, unplug the hose from the pump’s inlet pipe and empty the liquid into the container, being careful not to spill any of the liquid onto the mechanism’s body.

How to correctly fill a closed heating system from above

Filling a system with a 10 m height difference between the lower and upper points using a manual pump can be quite laborious if there is no electric pump available. In this scenario, an open drain crane at the lower point can be used to fill the closed system until the water flow starts from the upper point (for instance, by installing an automated air vent). At the lower point of the system, the static pressure equals the pressure in the liquid column to the upper point (i.e., 1 atm) because the drain valve overlaps.

It is now necessary to raise the pressure to the calculated maximum of 1.5 atm. Through the ball valve, we attach the standard 1.5-meter watering hose. We devise a thinly detachable attachment for a standard automobile pump’s hose that includes a pressure indicator. After filling the vertically rectified hose with water, roll the water from the hose into the system and connect the pump via the adapter. crossing over to the ball crane. To raise the starting static pressure by 0.5 atm at any point in the system, repeat steps three to five times. Avoid having air pumping inside of it.

Antifreeze circulating using a hand pump.

The choice of pressure values in the system and expansion tank

There is less chance of air getting into the system the higher the coolant’s working pressure. It is important to keep in mind that the heating boiler’s maximum allowable working pressure restricts operation. The circulation pump with a 6 m water pressure should be used if, during filling, the system reached a static pressure of 1.5 atm (15 m of water column). Art. generates a water column pressure of 15+6 = 21 m at the boiler’s entrance.

The operating pressure of certain boiler types is roughly 2 atm = 20 m of water.Art. Take care not to overload the boiler’s heat exchanger with excessively high coolant pressure!

Nitrogen, an inert gas, is supplied to a membrane expansion tank in the gas cavity at a factory-set pressure. 1.5 atm is its typical value (or bar, which is almost the same). By using a manual pump to force air into the gas cavity, this level can be raised.

Initially, the internal volume of the tank is completely occupied by nitrogen, the membrane is pressed with gas to the body. That is why it is customary to fill closed systems to a pressure level of not higher than 1.5 atm (maximum 1.6 atm). Then, by installing the expansion tank on the “return” in front of the circulation pump, we will not get a change in its internal volume – the membrane will remain motionless. Heating of the coolant will lead to an increase in its pressure, the membrane will move away from the tank body and squeeze the nitrogen. Gas pressure will increase by balance of the pressure of the coolant at a new static level.

Levels of expansion tank pressure.

Filling the system to a pressure of 2 atm will allow the cold coolant to immediately squeeze the membrane, which will squeeze the nitrogen to pressure 2 atm. Water heating from 0 ° C to 100 ° C increases its volume by 4.33 %. The additional fluid volume should enter the expansion tank. The large volume of the coolant in the system gives a large increment of it when heated. Too initial initial pressure of the cold coolant will immediately consume the capacity of the expansion tank, it will not be enough to take excess of heated water (antifreeze). Therefore, it is important to fill the system to a correctly certain level of pressure of the coolant. Filling the system with antifreeze, you need to remember its greater than the water, the coefficient of thermal expansion, requiring the installation of an expansion tank of a larger capacity.

Conclusion

Completing closed heating systems is more than just the last step before turning them on. The proper or improper implementation of this phase has the potential to significantly impact the system’s functionality and, in the worst scenario, even render it inoperable. Adherence to filling technology is essential for achieving a consistent heating.

How to fill the heating system with water

  • Filling water of the heating system
  • Washing the system before starting
  • How to determine the amount of liquid for the system
  • Classification of heating systems
  • The main ways to fill the system
  • How to fill the heating system in an apartment building
  • The launch process of an open gravitational heating system
  • Filling a closed heating system
  • Removal of air traffic jams, launching a heating system

Anyone may experience issues with the heating system’s water filling, but not everyone wants to hire experts to handle this kind of work, and in these days of marketing and sales, I’m not always willing to put my trust in them.

Metal-plastic pipes are typically used for the installation of heating pipelines because of their reasonable cost and practicality.

Filling water of the heating system

Diagram of a water heating device.

There are a few possible reasons for filling the heating system, including seasonal water discharge, potential emergencies that required draining the water, and the release of air traffic jams.

It is necessary to rinse the heating system before adding water, particularly if this is the first launch. Chips and preservation reagents are examples of factory production residues found inside the system’s structural components.

Substances like scale and lime stones accumulate in the heating system and pipes during maintenance if the system is not filled initially. Any of these goods has the potential to seriously harm the system as a whole, including the boiler.

Go back to the contents table.

Washing the system before starting

System for heating water.

If there is water in the heating system, then it must be drained. Next, the heating radiators should be dismantled. Then connect the pipes for the supply of water from the water supply system to the exit from the system, and the drain – to the entrance to the system. All formed compounds must be well fixed in advance prepared clamps. It should be remembered that with the high pressure the water will be supplied, the better the cleaning will pass (but not more than two atmospheres). To create pressure, the pump is usually used. You can sprinkle chlorine lime to water to achieve a disinfectant effect. On average, about two hours can take for such a procedure. At the end of the drain, pure water will go without additional impurities.

It is possible to clean the heating system with specific chemicals, such as anti-corrosion liquids or additives. They are not appropriate for all materials and can harm some system components, so they should be handled carefully.

The radiators are installed the other way around from how they were disassembled after cleaning. It should also visually inspect the system and look for leaks to confirm that it is tight.

Go back to the contents table.

How to determine the amount of liquid for the system

Diagram of a two-pipe natural circulation water heating system: 1 is the heater; 2 is the main riser; 3 is the expansion tank; 4 is the hot water line; 5 is the hot water riser to the radiators; 6 is the heating radiators; 7 is the chilled water descent pipes; 8 is the chilled water return line; and 9 is the stove.

To avoid excessive water overflow into the heating system or a lack of water, which can lead to the destruction of the structural elements of the system, boiling water, the formation of scale in pipes and radiators, you need to accurately calculate the necessary volume of water. For this, there is a simple formula in which the capacity of all radiators, a heating boiler, the volume of the expansion tank and other additional elements for water skipping, including pipes are summarized. The formula for calculating the volume of water in the pipes is as follows: π (3.14) × r pipes × the total length of the pipes. About 20% as a reserve are added to the total value.

Establish the amount of water required to fill the system, wash the system, and install a water cost meter at the system’s entrance. It is necessary to keep in mind and utilize the indications as the system is filled out.

When everything is set up to fill out the system, you should get ready or double-check the list of required supplies and equipment.

The following supplies are required for this:

  • gaskets (in case you need to compact pipes after checking the tightness of the system);
  • sealing tapes for pipes (serve to eliminate small leaks from the outside);
  • hoses (necessary for supplying water to the vibrational household pump and drainage of water to the heating system);
  • plastic container (tank – for the recruitment of the coolant before rolling it with a heating system);
  • clamps (will be needed to seal the joints of the hoses with the vibration pump).
  • pliers (necessary for fixing clamps on the hoses to attach them to the pump);
  • household vibration pump (serves for compulsory injection of water from the container into the heating system);
  • Manometer (with its help you can easily measure the current pressure in the system).

Go back to the contents table.

Classification of heating systems

To properly refuel the water heater. You must ascertain the type to which it belongs. Systems can be classified as either horizontal, vertical, combined, upper, lower, or with the method of wiring pipes. There are two types of system pipes that can be used to connect devices: single and two-pipe.

Water can also flow freely through the system or forcefully (if the pump is used). Differentiating between central and local heating systems is based on the scale of action. Dead end and passing in the direction of the water in the pipes. In daily life, all of these species are employed in various ways.

Go back to the contents table.

The main ways to fill the system

Go back to the contents table.

How to fill the heating system in an apartment building

Water heating system featuring a flowing water stream: The boiler is the first item, followed by the main riser, the expansion tank, the air collector, the feeding risers, the reverse risers, the reverse line, the expansion pipe, and the pump. 10-The pipes’ biasing direction.

The water valve located in the house should be blocked, water is gradually disclosed on the supply of the pipeline with the pipeline. At this time, the discharge on the reverse highway is blocked. Then you need to very slowly open the shutter on the back of the reverse pipeline until the opening is completely opened. Caution should be observed, because if you sharply open the water supply under the high pressure of the general heating system, this can lead to sharp pressure drops that cause hydraulic units. The impetus can be so powerful that one will be enough to break the system in the most vulnerable places. For some time it will be needed to fill the heating system. You should constantly observe the discharge. Когда пойдет вода без примеси пузырьков воздуха, а это можно понять по прекращению характерного звука шипения, перекрывают задвижку сброса. Now it"s time to open the water supply to the specific room. At the final stage, it remains to carry out air of air from all heating contours. This method of filling the system with water is provided for heating with lower wiring .

Handling the system with the upper pipe wiring appears to be much simpler. When opening in this situation, both shifts should open simultaneously and cautiously, and the discharge should be closed. You must ascend to the structure’s attic and open the air cranes that the design calls for in order to pull the air.

Go back to the contents table.

The launch process of an open gravitational heating system

Open heating systems are extremely uncommon in modern homes; these technologies are generally regarded as relics of the past. However, you should take into account the fact that they still need to be filled with water. Any such heating system has an expansion tank at the very top, which is made to hold water after it enters the system at a higher volume and pressure as the temperature rises. With or without a lid, the tank is an open container. Water is pumped into the system through the tank. Naturally, it will be difficult to pour large amounts of fluid into small containers, let alone on the upper point.

It will be most rational to use the usual vibrational pump of household purpose. To do this, prepare a spacious container, filled with water. Pre -prepared hoses are attached to the pump. Such a pump has a submersible type of structure. The hose through which water will be taken, you need to lower it into a prepared tank with water. The hose from which water will be produced is immersed in an expansion tank. Include the pump, the pressure in the system should be from one and a half to two atmospheres. When decreased, add water to the prepared tank and lower the hose into it. When the heating complex is filled, the water will be visible at the bottom of the expansion tank, you can consider the system filled.

Plan for installing a water heating system.

Through the expander, excess air will exit the first furnace’s pipes. Note that the water will progressively evaporate from the expander during the heating season when the system maintains a constant high temperature. Fuel must be applied, and the expander must be filled with water to the necessary level. The temperature on the thermometer that is connected to the heating boiler needs to be watched. Soon after the water’s temperature rises above 80°C, it will start to boil and spurt. In this instance, reducing the intensity of combustion requires blocking oxygen access to the furnace.

Go back to the contents table.

Filling a closed heating system

The most common type of heating system is closed. The expansion tank’s structure is where it differs and opens up. The expander is sealed and the system is filled in various ways in a closed heating complex.

You start by getting all the equipment and supplies ready. comprising: a large tank, hoses for forcefully filling the system with water from a tank, clamps for securing the hoses firmly, pliers for tightening clamps, and vibrating household pumps.

Plan for eliminating air from the heating system.

Before downloading, you need to tightly fasten the pump with prepared hoses using clamps. Fill the prepared tank with water and place near the crane filling the system. The pump should also be located nearby. The hose that takes water should be lowered into the tank, and the hose that supplies pumped water is fixed with a clamp on the cranes. Cranes and shutters for fragmentation of the heating complex should be open. Turn on the pump and start water supply to the pipes. On the pressure gauge, the pressure should gradually increase. When the entire circuit is filled, the testimony of the manometer will have to reach two atmospheres. After the pump should be turned off. Disconnect the hoses and block the cranberry crane.

You can use the water supply to fill the heating complex if using the pump isn’t an option. The above-described scheme and this one are fairly similar. It suffices to attach the hose’s one end to the water tap for intake and the other to the system for filling, then gradually open the casual and tap. In this scenario, an additional pressure gauge will need to be used to monitor the pressure.

Eliminating extra air from the system’s contour will be the last step in the water filling process. Specialized devices are available in modern installations for this exact purpose. With this gadget on the bypass, you can compromise the system.

Working with two people will make filling the heating system the most convenient because it is essential to regulate the system’s pressure and the pump’s operation, be close to the download tap, and simultaneously check the tightness and fragmentation process of the heating radiators during the filling process.

Go back to the contents table.

Removal of air traffic jams, launching a heating system

Air traffic jams are eliminated from the heating system.

Even with complete filling, air can still build up in the heating complex. This will increase the system’s exposure to corrosion of the pipeline’s internal components and the radiators, as well as create persistent knocks and noises. Because of the numerous air turns in launched water and leaky compacted compounds, air stays in the pipes.

To release excess air from heating pipes after filling it, you need to open air shutters and taps and wait up to three hours. This is necessary that all air bubbles from the inner walls of heating devices rise to the surface and go through special holes. The use of the vibration pump will help to facilitate the process. At the end of the process, it is necessary to close all the damper and create the right pressure for the correct operation in the system, it should be at the level of one and a half atmospheres. The leveling of pressure is carried out by recess – adding the missing amount of water. After starting, the pressure will rise to two atmospheres.

Now you can start starting the heating complex. If the heating is new and is launched for the first time, then under the terms of the warranty agreement this work is performed by specialists of the authorized service centers of the manufacturer. Repeated launches are carried out independently. Experience the heating complex with gradual heating during the day. If no shortcomings in the heating complex are detected, then it can be displayed at full power. It is worth noting that the first two weeks of the system can be accompanied by knocking in pipe wiring. This should not be alarming, since all the air cannot be released during the fabric, it is self -fraught with in the process of work.

The heating season should be approached with all necessary precautions.

We’ll go over the crucial procedures to guarantee effective insulation and heating for your house in this guide on "How to correctly fill a closed-type heating system." It is essential to maintain optimal warmth and energy efficiency throughout your home by properly filling a closed-type heating system. We’ll go over the significance of bleeding air from the system, the proper pressure levels, and the use of the proper water and additives. We’ll also go over common safety errors and precautions to take during the filling process. You may efficiently optimize the heating system in your house for comfort and cost savings by adhering to these straightforward but essential recommendations.

How to fill out a closed heating system with any type of coolant

How to fill and turn on the closed-type heating system is a crucial question that comes up after the heating devices are installed. Although its features cause common difficulties for average users, the process itself is straightforward. These consist of the coolant pressure and upholstery point selection.

Open and closed heating systems: the principle of filling

An expansion tank is installed at the upper point of the open system. The solewood liquid’s surface is in direct contact with the surrounding air. One feature of the closed system is a membrane expansion tank that is completely sealed off from the outside environment.

Any kind of heating system can be filled with the following:

  • tap water supplied to the lower point of the system – through the feed valve;
  • water (distilled) or antifreeze, supplying liquid from the container (well, reservoir):
  • manually with manually and/or by means of a pump to the top (a fitting under the air vent or through an open expansion tank);
  • pumping by the pump through the lower point – the subfront input.

A lot of homeowners are aware of the easiest (and worst!) method for adding water to open systems using an expansion tank. Intermittently pour water or antifreeze inside to allow for the release of air. It is not advised to repeat this procedure in closed systems with the upper air vent nozzles. After initially filling the system, the air dissolves in the poured water after passing through a layer of it. You will be guaranteed air plugs that stop water from flowing through radiators and pipes.

When the closed-type heating system is being filled? It is advised to use the lower feed valve to supply fluid under pressure (from the water supply or container through the pump) into any heating system.

Where the heating system is located.

When the coolant is filled

There are just two circumstances in which this technological operation must be used:

  • starting heating into operation (at the beginning of the heating season);
  • Repeated start after repair work.

In late spring, water-beam water is usually drained for two reasons:

  1. Water is inevitably polluted by corrosion products (inside radiators, metal -plastic and polypropylene pipes are not subject to it). Leaving the old water for the new season, you risk breaking the circulation pump with solid pollution.
  2. Unlocked flooded systems of country houses can “defrost” with sudden cooling – such cases are not uncommon.
    In this sense, the coolant-antifreeze is preferable. The qualitative composition has high anti-corrosion properties that increase the "interlocal" interval to 5-6 years. Cases of uninterrupted operation of heating on the same volume of antifreeze 15-17 years are known. Low-quality antifreeze is recommended to be drained after 2-3 years.

Adding antifreeze to a heating system in a quantity.

Filling technology: where to serve the coolant

The capacity and pump are essential components as they generate the necessary pressure in the liquid coolant. Submissive varieties of "baby" or "dwarf" plants, which are well-liked by gardeners, are excellent choices for watering areas that are above reservoir levels. There is proof that manual pumps can fill closed systems successfully. These pumps can be used for specialized tasks like pumping liquid chemical products or motor fuels from barrels, or they can be used to spray protective solutions on garden crops. By using the manometer to control the pressure, any heating scheme can be filled in with success.

Antifreeze is added to the system using a submersible vibration pump.

The first operation is the choice of a fluid entry point. If the pressure created by the pump lifts the liquid to the top of the system, it should be connected at the lower point of the boiler room – the feed pipe with the coolant cut in front of the boiler into the “return”. In addition to entering the recharge, a separate drain output is necessary (two different system nodes). The first is equipped with a valve (ball valve) and a check valve, the second – only a valley (ball crane). If the lower point of the system is a fitting of water drain from the boiler, then you can lower/fill the system through it with water. Since the check valve is not installed behind the boiler drain (generally behind the draining), any offset of the pump will entail the flow of the processed fluid – you need to quickly block the tap in front of the fitting.

The typical plum unit/subtract’sdesign.

We fill out the system from below

Now let’s get back to adding fluid to the system. We employ the capacity of an appropriate volume (a 200 l plastic barrel works well). We reduce the pump’s pressure until it reaches 1.5 atm, the maximum pressure needed for the fluid to download (usually between 1 and 1.2 atm). A pressure pump that can withstand such pressure must be 15 m in size (it can reach 40 m in a submersible "baby").

After adding water to the barrel, we turn on the pump and check the fluid level while positioning it correctly above the input pipe to avoid "configuration." After lowering the level, we add water. In order to avoid submerging the loading pump case in liquid and failing to wash it, the antifreeze should be pumped from a bucket with a smaller capacity, just dear the input pipe. Antifreez will need to be added frequently, with intermittent pump shut-offs.

Using replacement water collection containers, Maevsky open cranes are used to fill the system on heating radiators that have been installed. Вогда жидкость пойдет из всех воздухоотводчиков, краны закрывают краны, продолжая процесс закачки.

The boiler device is appropriate for controlling the pressure on the pressure gauge. We fill the system and monitor the point at which the required pressure is reached while keeping track of its value when it surpasses the hydrostatic equal to the pressure in the liquid column height from the lower to the upper point of the system (height 5 m gives static pressure of 0.5 atm).

"Baby" slender antifreeze pump.

After the system is filled, the pump should be turned off, the air cranes opened (the pressure will eventually drop), and the water pumped up. We move the air bubbles around by repeating the procedure multiple times.

The system is now fully stocked in case there are leaks. The liquid is under pressure once the pump in the hose that is attached to the output pipe has been turned off. If the antifreeze is pumped, unplug the hose from the pump’s inlet pipe and empty the liquid into the container, being careful not to spill any of the liquid onto the mechanism’s body.

How to correctly fill a closed heating system from above

Filling a system with a 10 m height difference between the lower and upper points using a manual pump can be quite laborious if there is no electric pump available. In this scenario, an open drain crane at the lower point can be used to fill the closed system until the water flow starts from the upper point (for instance, by installing an automated air vent). At the lower point of the system, the static pressure equals the pressure in the liquid column to the upper point (i.e., 1 atm) because the drain valve overlaps.

It is now necessary to raise the pressure to the calculated maximum of 1.5 atm. Through the ball valve, we attach the standard 1.5-meter watering hose. We devise a thinly detachable attachment for a standard automobile pump’s hose that includes a pressure indicator. After filling the vertically rectified hose with water, roll the water from the hose into the system and connect the pump via the adapter. crossing over to the ball crane. To raise the starting static pressure by 0.5 atm at any point in the system, repeat steps three to five times. Avoid having air pumping inside of it.

Antifreeze circulating using a hand pump.

Step Description
1 Check the pressure in the system.
2 Top up the system with water if the pressure is low.
3 Bleed air from the radiators.
4 Add inhibitor to prevent corrosion and limescale buildup.
5 Ensure all radiators are heating evenly.

It’s essential to maintain an efficient heating system in your house for both financial savings and comfort. An essential part of this procedure is filling a closed-type heating system correctly. You can optimize the system’s performance and avoid problems like corrosion and airlocks by taking a few easy steps.

First and foremost, it’s crucial to fully flush the system to get rid of any debris or contaminants before filling it. This keeps the system’s integrity intact and avoids obstructions that might make it difficult for it to operate properly. Flushing also makes sure that the fresh water that is added during filling is clean, which lowers the chance of corrosion and increases the system’s lifespan.

Next, it’s critical to use the appropriate water and additives when filling the system. Generally, to stop corrosion and scale buildup in the system, a solution of water and an appropriate inhibitor is advised. Using demineralized or deionized water can also reduce the possibility of mineral deposits, which can reduce the effectiveness of heat transfer.

Bleeding any air from the system during the filling process is essential to preventing airlocks, which can impede water circulation and lower heating efficiency. Typically, automatic air vents or radiator bleed valve openings can be used for this. Consistent performance can be ensured by bleeding and inspecting the system on a regular basis, particularly after repairs or maintenance.

Lastly, it’s advised to routinely check the system for leaks or pressure drops after it has been filled. By taking quick action to resolve any problems, you can keep the heating system operating efficiently and avoid having water damage to your property. Frequent upkeep, such as routine inspections and modifications, can help a system last longer and function at its best.

In conclusion, a closed-type heating system’s longevity and correct operation depend on its filling. You can ensure your home stays warm and comfortable while minimizing energy costs and maintenance requirements by following these steps, which include flushing the system, using the appropriate water and additives, bleeding air, and keeping an eye out for leaks.

Video on the topic

How to easily fill / pump up / heating system of a closed type gas boiler.

What type of heating you would like to have in your home?
Share to friends